| Studies & Reports |
Date |
PDF File Size KB |
|
Draft Environmental Impact Report - Volumes 1--5 |
|
Table of Contents |
March 25, 2008 |
136 |
|
Executive Summary |
March 25, 2008 |
2,125 |
|
Glossary |
March 25, 2008 |
38 |
|
VOLUME 1 of 5: Draft Environmental Impact Report |
|
Chapter 1 Introduction and Summary |
March 25, 2008 |
1,811 |
|
Chapter 2 Project Description |
March 25, 2008 |
7,410 |
|
Chapter 3 Mitigation and Monitoring
Program |
March 25, 2008 |
574 |
|
Chapters 4.0 Environmental Analysis
Introduction |
March 25, 2008 |
259 |
|
4.1 Land Use |
March 25, 2008 |
516 |
|
4.2 Agriculture |
March 25, 2008 |
214 |
|
4.3 Geology, Soils, and
Seismicity |
March 25, 2008 |
1,161 |
|
4.4 Surface Water Hydrology |
March 25, 2008 |
596 |
|
4.5 Groundwater |
March 25, 2008 |
488 |
|
4.6 Surface Water Quality |
March 25, 2008 |
349 |
|
VOLUME 2 of 5: Draft Environmental Impact Report |
|
4.7 Public Health and Safety |
March 25, 2008 |
546 |
|
4.8 Biological Resources |
March 25, 2008 |
838 |
|
4.9 Jurisdictional Wetlands |
March 25, 2008 |
250 |
|
4.10 Transportation |
March 25, 2008 |
482 |
|
4.11 Air Quality |
March 25, 2008 |
504 |
|
4.12 Noise |
March 25, 2008 |
411 |
|
4.13 Cultural Resources |
March 25, 2008 |
315 |
|
4.14 Visual Resources |
March 25, 2008 |
2,051 |
|
4.15 Public Services,
Utilities, and Recreation |
March 25, 2008 |
491 |
|
4.16 Energy |
March 25, 2008 |
144 |
|
Chapter 5 Impacts of Combinations of
Alternatives |
March 25, 2008 |
379 |
|
Chapter 6 CEQA-Required Sections |
March 25, 2008 |
408 |
|
Appendix A Agency
Response Letters to the Notice of Preparation/Initial Study |
March 25, 2008 |
1,496 |
|
Appendix B Revised Final
Screening Report |
March 25, 2008 |
8,306 |
|
Appendix C Cumulative
Projects Scenario and Cumulative Projects List |
March 25, 2008 |
213 |
|
Appendix D Letter from
California Department of Public Health, July 16, 2007 |
March 25, 2008 |
228 |
|
Appendix E Numeric Water
Quality Criteria and Narrative Water Quality Criteria |
March 25, 2008 |
368 |
| Appendix F Biological
Resources |
- |
- |
| Appendix F.1 Biological
Resources - Special-Status Plants |
March 25, 2008 |
357 |
|
Appendix F.2 Biological
Resources - Special-Status Animals |
March 25, 2008 |
331 |
|
Appendix F.3 Biological
Resources - Vegetation Communities |
March 25, 2008 |
370 |
|
Appendix G Annual Energy
Consumption by Alternative |
March 25, 2008 |
61 |
|
Appendix H Traffic
Calculations |
March 25, 2008 |
84 |
|
VOLUME 3 of 5: Draft Environmental Impact Report |
|
Executive Summary and Draft Engineering Report |
-December 7, 2007 |
369 |
|
VOLUME 4 of 5: Draft Environmental Impact Report |
|
TM 1: Water Reuse System Storage Model Technical Memorandum |
December 7, 2007 |
843 |
|
TM 2: Geotechnical Evaluation Technical Memorandum |
December 7, 2007 |
6,296 |
|
Attachment 1: Field Exploration and Laboratory Testing |
December 7, 2007 |
756 |
|
Attachment 2: Site Conditions |
December 7, 2007 |
7,684 |
|
Attachment 3: Description of Potential Geologic and Geotechnical Hazards |
December 7, 2007 |
54 |
|
Attachment 4: Analyses |
December 7, 2007 |
513 |
|
Attachment 5: Boring Logs |
December 7, 2007 |
1,209 |
|
Attachment 6: Well Completion Diagrams |
December 7, 2007 |
165 |
|
Attachment 7: Laboratory Test Results |
December 7, 2007 |
10,781 |
|
Attachment 8: Reconnaissance-level Geologic Study |
December 7, 2007 |
2,624 |
|
Attachment 9: Summary of Exploratory Drilling-Jordan Winery (AVR) Site |
December 7, 2007 |
5,186 |
|
Attachment 10: Resistivity Survey Results-Brookfield (PHR) Site |
December 7, 2007 |
3,249 |
|
Attachment 11: Existing Data Reviewed |
December 7, 2007 |
935 |
| Exhibit A: Existing Data "Geotechnical Reports" Reviewed: |
- |
- |
|
Alexander Valley Road |
December 7, 2007 |
1,365 |
|
Kelly Farm, Brown Farm & Alpha Farm |
December 7, 2007 |
11,518 |
|
West College |
December 7, 2007 |
10,791 |
|
VOLUME 5 of 5: Draft Environmental Impact Report |
|
TM 3: Site Hydrology Evaluation Technical Memorandum |
December 7, 2007 |
4,178 |
|
TM 4: Groundwater Evaluation Technical Memorandum |
December 7, 2007 |
6,378 |
|
TM 5: Pump Stations Evaluation Technical Memorandum |
December 7, 2007 |
379 |
|
TM 6: Basis for Costs Technical Memorandum |
December 7, 2007 |
229 |
|
TM 7: Regulations and Approvals for Storage Alternatives Technical Memorandum |
December 7, 2007 |
315 |
|
TM 8: Implementation Evaluation Technical Memorandum |
December 7, 2007 |
105 |
| Final
Environmental Impact Report |
|
Table of Contents |
October 6, 2008 |
12 |
|
Chapter 1 Introduction and Summary |
October 6, 2008 |
177 |
|
Chapter 2 Response to Comments |
October 6, 2008 |
15 |
|
Master Responses |
October 6, 2008 |
45 |
|
Response to Comments Introduction |
October 6, 2008 |
14 |
|
Responses to 100 series, Federal Agencies |
October 6, 2008 |
42 |
|
Responses to 200-300 series, State,
Regional and Local Agencies |
October 6, 2008 |
252 |
|
Responses to 400 series, Interested
Individuals |
October 6, 2008 |
219 |
|
Responses to 500 series, Public
Hearing Comments |
October 6, 2008 |
24 |
|
Chapter 3 Lead Agency Changes |
October 6, 2008 |
94 |
| Chapter 4 Comment Letters and Oral
Comments (listed below) |
|
Comment Letters - Agencies (Comment
Letters 100's - 300's) |
October 6, 2008 |
3,485 |
|
Comment Letters - Individuals
(Comment Letters 400's) |
October 6, 2008 |
2,593 |
|
Transcripts from Public Hearing
(Comment Letters 500's) |
October 6, 2008 |
1,028 |
|
Chapter 5 List of Preparers and
References |
October 6, 2008 |
38 |
|
Chapter 6 Replacement Pages |
October 6, 2008 |
2,200 |